• 2020 New Arrival
  • Classical C.V. Series
  • IC C.C. Series
  • Temp.-Inductive C.C. Series
  • 12V&24V Universal Input Series
  • External C.C. Series
  • Ultra-Slim High-Density Series
  • High-Efficacy Series
  • CCT-Tunable Series
  • Ultra-Warm Series
  • Ultra-Cold Series
  • Full-Spectrum Series
  • Food Lighting Series
  • Bulit-in IC Series
  • Ultra-Long Series
  • Short-Unit Cuttable Series
  • Multi-View Series
  • Sign Backlight Series
  • Colorful-Light Series
  • RGB Mixes-Light Series
  • Pixel Control Series
  • Silicone Extrusion Waterproof Sereis
  • LED Strip Connector
  • LED Strip Profile
  • LED Driver
  • LED Controller
  • 2020 New Arrival
  • 2835 Top-View Series
  • 2835 Ultra-Slim Series
  • 2216 Ultra-Slim High-Density Series
  • 3014 Side-View Series
  • 2020 New Arrival
  • 230VAC Stream-Line Series
  • AC Glide Series-230VAC
  • 2020 New Arrival
  • Dome Series NS-100 & NS-200
  • Plane Series NS-102 & NS-202
  • Plane Series NS-205
  • Multi-View Series NS-307
  • Mini Series NS-103 & NS-203
  • Slim Series NS-204
  • Color-Flow Series NS-206
  • FleXCite Series NS-107
  • 2020 New Arrival
  • AC Link CubeX Series SL-100
  • DC Link CubeX Series SL-200
  • Link Slim-Line Series SL-300
  • Link Flow Series SL-400
  • EU & AUS Classical Series
  • US & CA Series
  • CCT Tunable Series
  • CCT Switchable Series
  • RGB Series
  • RGBW Series
  • UP & Down Illumination Series
  • IP44 Rating Series
  • Light Inductive Series
  • Frameless Series
  • Emergency Series
news > We're back for work already under effective precaution

We're back for work already under effective precaution

2020-02-11 GL

We're back for work already under effective precaution

Link to LinkedIn: https://www.linkedin.com/feed/update/urn:li:activity:6632934790108712961

Link to Wechat: https://mp.weixin.qq.com/s/aaj9jF2UL4sKxcqPPgJ5iQ

Link to Facebook: https://www.facebook.com/108345170566178/posts/205237674210260/?vh=e&d=n

< Official Start Time > 

- Feb. 10th , 8 o’ clock in the morning.

Factory Gate

IMG_9839.JPG


Admittance Procedure: 

Temperature Measurement->Receive Pass->Hand Disinfection->Replace New Mask->Wear ESD Protective Clothes->Go to WorkIMG_9839.JPG

IMG_9863.JPGimage.png


< Operation and Production Running Scene >

LED Package Line

微信图片_20200212095530.jpg

微信图片_20200212095627.jpg

微信图片_20200212095641.jpg


SMT Line

IMG_9858.JPG


Soldering Line

微信图片_20200212094316.jpg


Processing Line

微信图片_20200212094340.jpg

微信图片_20200212094354.jpg


Packing Line

微信图片_20200212094401.jpg


Extrusion Line of Waterproof Processing

QQ截图20200211181551.pngQQ截图20200211181655.png

微信图片_20200212112308.jpg

微信图片_20200212112255.jpg


Operation Center Office (Engineering、Quality、Production、Purchasing Dept' etc.)

IMG_9852.JPG


R&D Center Office

IMG_9851.JPG


Sales Center Office

IMG_9880.JPG


< Comprehensive Previous Precaution Before Resume Work >

Well prepared for the safe reproduction according to local government request, by establishing 7 epidemic precaution groups,  publicity group, temperature monitoring group, disinfection group, personnel safety group, material support group, emergency response group and canteen safety group, for practical and detailed work.

- Collecting and tracing employee information, making an inventory of order & material stock & production capacity, evaluating supplier status of resume work.

- Unite a thought, comprehensive arrangement, division of labor and coordination of work, systematically, fully protected.


< Comprehensive Implementation of Epidemic Precaution Measures Before & After Resume Work >

- Publicity Group: Make publicity and guidance to public on display screen, Wechat, bulletin board, morning meeting etc.

IMG_9871.JPGIMG_9862.JPG


- Temperature Monitoring Group: Everyone must take the temperature measurement everyday on the gate while entering the factory every time.

IMG_9865.JPGIMG_9875.JPG


- Disinfection Group: Perform disinfection for all staff, working space and public space.

IMG_9867.JPGIMG_9861.JPG

IMG_9873.JPGIMG_9847.JPG

微信图片_20200211160647.jpgQQ截图20200211124106.png


- Personnel Safety Group: Make registration, tracking and overall arrangement for every staff, to ensure safe operation and production.

IMG_9844.JPG微信图片_20200210181614.jpg


- Material Supply Group: Purchase and supply materials such as medical material and daily necessities, reducing the risk by restricting outside movement of personnel.

QQ图片20200211125359.jpgQQ图片20200211125354.jpg


- Emergency Response Group: To accept measures like isolation, medical treatment and aftercare of persons with abnormal health.


- Canteen Safety Group: To accept measures like isolation, medical treatment and aftercare of persons from canteen with abnormal health.

Previous article:NoneNext article:(Feb, 2020) Newsletter